Applicability
This revision applies to current maintained remote-node configurations. It supersedes RD-SM-21-03 for routine planning. Historical K-Series procedures remain reference material and must not be applied to a different configuration without engineering review.
Service intervals
Review remote health and queue exceptions weekly. Reconcile receipt ledgers and alternate-path logs monthly. Perform a documented local power-recovery and fallback-path check at each scheduled six-month service visit, or earlier after a configuration change or unplanned outage.
Installation-specific schedules may shorten these intervals. A missed check is recorded as an exception, not silently treated as completed.
Required service record
Record the node identifier, configuration revision, check date, technician designation, observed state, and any deferred work. Preserve evidence of fallback operation. A successful remote reply does not replace inspection of an unresolved power, identity, or record-integrity fault.
Return to service
Close an exception only after its supporting evidence is attached to the service record. Where the origin of returned traffic is uncertain, maintain the restriction pending independent review.