Relay Directorate / Institutional CommunicationsPublic Information Network
Systems Engineering / Public reference

K-Series controlled field evaluation.

Public extract of the first K-Series prototype evaluation protocol.

Evaluation scope

Prototype relay assemblies are to be evaluated on instrumented test paths before assignment to unattended installations. A completed laboratory evaluation is not a declaration of operational service.

Acceptance checks

The test operator must record the supplied message sequence, local receipt order, power interruptions, and the route selected after each interruption. A comparison receiver maintains an independent event log. Duplicate receipt and delayed delivery must remain distinguishable from new traffic.

A prototype passes the recovery check only when retained messages can be accounted for after power restoration and the operator can identify which route carried each recovered item.

Program disposition

Controlled evaluation began in 1982. The fixed-relay configuration subsequently entered the public system register as KZ-04 in 1983. Later configurations retained the K-Series naming convention but require their own commissioning records.

Related records